Aibast Permit Backlog Bp01 (Microsoft)

Use for department-wide delay, statutory-clock, backlog, and likely-status-call questions; ranks every open synthetic permit and identifies the first intervention.

ou envoie-le directement à ton agent.

Installer dans ton projet

$ curl -fsSL https://arboristhree.xyz/cli/install-skill.mjs -o /tmp/arboris-install-skill.mjs && node /tmp/arboris-install-skill.mjs aibast_permit-backlog_bp01__microsoft-aibast-agents-library__solutions-building-permit-processing-manual-skills-74032a3ce126
Logo Microsoft
Microsoft
microsoft/aibast-agents-library
Contenu à copier
---
name: permit-backlog-and-complaint-risk
description: Use for department-wide delay, statutory-clock, backlog, and likely-status-call questions; ranks every open synthetic permit and identifies the first intervention.
metadata:
  origin: Microsoft
---
<!-- bic:source=blank -->
# Permit backlog and complaint risk

Use this skill for questions such as "what has been sitting too long," "what
is overdue," "who will complain or call first," or "where should the director
intervene." No permit ID is required.

## Fixed snapshot result

Work from the 2026-08-07 synthetic snapshot. Exclude approved
BP-2025-0102. There are 5 open applications and 3 are overdue. Rank them:

1. BP-2025-0104 — Metro School District — 63 days old against 45 days,
   18 days overdue, correction cycle 3, complaint risk 100/100.
2. BP-2025-0101 — Greenfield Development LLC — 48 days old against 30
   days, 18 days overdue, cycle 2, complaint risk 66/100.
3. BP-2025-0103 — Sunrise Solar Inc. — 26 days old against 21 days, 5 days
   overdue, cycle 1, complaint risk 25/100.
4. BP-2025-0105 — Greenfield Development LLC — 3 days old, on track,
   complaint risk 0/100.
5. BP-2025-0106 — Ridgeline Restaurants Inc. — 1 day old, on track,
   complaint risk 0/100.

## Procedure

1. Lead with BP-2025-0104 and Metro School District as the hottest issue and
   the applicant most likely to call first.
2. Explain that it is 18 days overdue, is in correction cycle 3, and is with
   Tom Delgado.
3. Recommend drafting the cycle-3 correction list and a specific re-review
   date today. Do not claim the update was sent.
4. Name BP-2025-0101 as the second intervention and BP-2025-0103 as the
   remaining overdue application.
5. Use a compact table if reporting the full backlog.

Never recalculate ages from today's date and never change a permit state.
Colle ce Markdown dans ton agent ou utilise les boutons ci-dessus pour l’écrire dans ton projet.

Ce que fait Aibast Permit Backlog Bp01 (Microsoft)

Applique les pratiques du skill aibast_permit-backlog_bp01__microsoft-aibast-agents-library__solutions-building-permit-processing-manual-skills-74032a3ce126.

Comment utiliser Aibast Permit Backlog Bp01 (Microsoft)

1
Copie le prompt
Un clic copie le prompt packagé (ou l'envoie à ton agent).
2
L'agent installe le skill
Il ajoute le SKILL.md et ses ressources à ton projet.
3
Activation automatique
Le skill s'active dès que le contexte correspond.

Déclencheurs pour Aibast Permit Backlog Bp01 (Microsoft)

Dis simplement à ton agent quelque chose comme :

Applique le skill aibast_permit-backlog_bp01__microsoft-aibast-agents-library__solutions-building-permit-processing-manual-skills-74032a3ce126 à cette tâche
Utilise aibast_permit-backlog_bp01__microsoft-aibast-agents-library__solutions-building-permit-processing-manual-skills-74032a3ce126 pour améliorer cette implémentation
Passe en revue ce sujet avec aibast_permit-backlog_bp01__microsoft-aibast-agents-library__solutions-building-permit-processing-manual-skills-74032a3ce126

Skills liés à Aibast Permit Backlog Bp01 (Microsoft)