Logo Microsoft
Agents & OrchestrationSûr100100/100

Aibast Transfer Plan (Microsoft)

Use when a supply chain manager asks for review-ready inter-warehouse move options.

ou envoie-le directement à ton agent.

Installer dans ton projet

$ curl -fsSL https://arboristhree.xyz/cli/install-skill.mjs -o /tmp/arboris-install-skill.mjs && node /tmp/arboris-install-skill.mjs aibast_transfer_plan__microsoft-aibast-agents-library__solutions-inventory-rebalancing-manual-skills-7046e46e31f6
Logo Microsoft
Microsoft
microsoft/aibast-agents-library
Contenu à copier
---
name: aibast-transfer-plan
description: Use when a supply chain manager asks for review-ready inter-warehouse move options.
metadata:
  origin: Microsoft
---
<!-- bic:source=blank -->
# Proposed transfer plan

## Use

Use when the user asks for proposed inter-warehouse moves in their own
language. Route the exact locked persona prompt "Show me the proposed warehouse moves, but do not move or reserve anything." here. Route similar persona-language requests here rather than requiring the user to name an operation.

## Required inputs

None required. If the user names a specific SKU or facility pair, scope the
plan to it; otherwise propose transfers for every SKU with a material
surplus-to-deficit pairing across the four facilities.

## Clarifying questions

- If the user wants a plan for a specific SKU or lane only, confirm scope
  before producing the full multi-SKU plan.
- If the user asks the agent to actually execute a move, clarify that this
  skill only prepares a proposal and that execution requires an authorized
  ERP/WMS owner using an approved production tool.

## Procedure

1. Use only the facility-and-SKU synthetic snapshot and the cost-and-review
   rules knowledge sources (transfer-cost-per-kg matrix, SKU weights).
2. Identify, per SKU, facilities with a material surplus (on-hand minus
   forecast > 200) and facilities with a material deficit (on-hand minus
   forecast < -200). Pair the largest surplus facility with the largest
   deficit facility first, moving the smaller of the two magnitudes, and
   repeat until surpluses or deficits are exhausted.
3. For each proposed move, cite the SKU identifier (e.g. `SKU-4401`), the
   from/to facility, the proposed quantity, the SKU weight, and the
   estimated transfer cost (quantity × weight × the from/to per-kg rate
   from the cost-and-review rules knowledge source).
4. Total the proposed units and total estimated transfer cost, and note the
   synthetic ground-freight planning assumption (2–5 business days).
5. State explicitly and verbatim in the response that "No inventory has
   been reserved, picked, shipped, or moved" — this proposal is for
   inventory, warehouse, finance, and transportation review only.
6. Separate the proposed moves (evidence-based estimate) from the
   recommendation to review with facility owners from the authorization
   gate required before any real transfer.
7. State plainly that every quantity and cost figure is a synthetic
   planning estimate from a fixed snapshot, not a completed or scheduled
   shipment.

## Output

A table of proposed SKU-level transfers (from, to, quantity, weight,
estimated cost), total units and total estimated cost, and a closing
statement that no inventory has been reserved, picked, shipped, or moved
and that execution requires authorized ERP/WMS review.

## Safety boundary (no side effects)

This skill never reserves, picks, ships, or moves inventory, and never
changes a reorder point or other inventory policy — it only proposes.
Any real transfer requires an authorized ERP/WMS system owner and an
approved, connected production tool.

## Assumptions

- Transfer pairing uses a simple largest-surplus-to-largest-deficit
  heuristic from the synthetic knowledge source; it is a planning
  illustration, not an optimized logistics solve.
Colle ce Markdown dans ton agent ou utilise les boutons ci-dessus pour l’écrire dans ton projet.

Ce que fait Aibast Transfer Plan (Microsoft)

If the user wants a plan for a specific SKU or lane only, confirm scope
If the user asks the agent to actually execute a move, clarify that this
Transfer pairing uses a simple largest-surplus-to-largest-deficit

Comment utiliser Aibast Transfer Plan (Microsoft)

1
Copie le prompt
Un clic copie le prompt packagé (ou l'envoie à ton agent).
2
L'agent installe le skill
Il ajoute le SKILL.md et ses ressources à ton projet.
3
Activation automatique
Le skill s'active dès que le contexte correspond.

Déclencheurs pour Aibast Transfer Plan (Microsoft)

Dis simplement à ton agent quelque chose comme :

Applique le skill aibast_transfer_plan__microsoft-aibast-agents-library__solutions-inventory-rebalancing-manual-skills-7046e46e31f6 à cette tâche
Utilise aibast_transfer_plan__microsoft-aibast-agents-library__solutions-inventory-rebalancing-manual-skills-7046e46e31f6 pour améliorer cette implémentation
Passe en revue ce sujet avec aibast_transfer_plan__microsoft-aibast-agents-library__solutions-inventory-rebalancing-manual-skills-7046e46e31f6

Skills liés à Aibast Transfer Plan (Microsoft)